CHS performs dredging the lower reaches of the river Guadalentin in Totana

Source:

The action aims to remove sediment buildup caused by the flood of St. Wenceslas, last year

The Segura basin (CHS), an autonomous body under the Ministry of Agriculture, Food and Environment, has started dredging and disposal of sediments from the low-water channel Guadalentin River in the town of Totana.

The work, which has an operating budget of € 58,942, is to remove accumulated during the great flood caused by the flood of St. Wenceslas in late September last year carryover.

The works will affect a stretch of nearly six miles long and foster evacuation of low circulating flow in the area through the stress gradient low-water channel in the central region of the channel, reducing stagnation and proliferation vegetation.

Moreover, non-native vegetation that currently pervades the runway Guadalentin to improve drainage capacity, and proceed to the stabilization and repair of the side slopes damaged by the flood and the consolidation of service road will be deleted.

noticia
CHS performs dredging the lower reaches of the river Guadalentin in Totana, Foto 1

Comment this news on Facebook

If you want to comment on this news to the administrators of Totana.net, fill out the form below:

Send notification Code: 2024423
The owner of the personal data, collected in this form, expressly authorizes Alamo Networks, S.L. to treat said data in a computerized way and to be able to incorporate it into your database. The user may exercise the rights of access, rectification, cancellation and opposition of their personal data, in the terms established by the LOPD, at the address set in C / Alamo 8, 30850, Totana (Murcia). For your convenience you can also exercise your rights by email at the address info@totana.net
This website uses cookies to facilitate and improve navigation. If you continue browsing, we consider that you accept its use. More information